The FIDIC Conditions of Contract for Construction, the most widely used standard contract form for civil engineering works globally, allocating design responsibility to the employer and construction responsibility to the contractor.
The FIDIC Red Book is the informal name for the FIDIC Conditions of Contract for Construction (officially titled "Construction" in the 1999 suite and updated in 2017), published by the Federation Internationale des Ingenieurs-Conseils. It is the most widely used standard contract form for civil engineering and building works worldwide, and it is the foundation on which most development-bank General Conditions of Contract for works are based.
What is the FIDIC Red Book?
The Red Book allocates design responsibility to the employer (the procuring entity), who provides the design and drawings, and construction responsibility to the contractor, who builds to those designs. Payment is typically made on a remeasured basis using a boq, with quantities adjusted to reflect what is actually built. This distinguishes the Red Book from the fidic-yellow-book, where the contractor also designs.
The Red Book contains 20 clauses covering the engineer's role, commencement and completion, quality and testing, payment and variations, force majeure, risk and insurance, claims, disputes, and termination. The engineer is a named independent party who administers the contract, certifies payments, and makes initial determinations on claims. Disputes that cannot be resolved by the engineer proceed to a Dispute Adjudication Board and, if necessary, to international arbitration. The scc is used to adapt Red Book terms to the specific project and jurisdiction.
Why the FIDIC Red Book matters for bidders
Most major infrastructure contracts financed by the World Bank, ADB, AfDB, AIIB, and other MDBs use Red Book conditions or conditions derived from them. Contractors who understand the Red Book's risk allocation - particularly the claims notification procedures in Clause 20, which impose strict time limits for submitting claims - are better equipped to protect their commercial position during execution. The 28-day notice requirement for claims is absolute under the 1999 edition; missing it can extinguish a valid claim entirely. The 2017 edition introduced a more structured early warning and dispute avoidance process, but the fundamental allocation of risk between employer-provided design and contractor-executed construction remains the same.
FAQ
What does "Red Book" refer to?
The "Red Book" is the informal industry nickname for the FIDIC Conditions of Contract for Construction, taken from the red colour of the book's cover. FIDIC publishes several contract forms, each with a distinctive cover colour: Red (Construction), Yellow (Plant and Design-Build), Silver (EPC/Turnkey), and White (Client/Consultant).
Is a FIDIC Red Book contract the same as the World Bank GCC?
No, but they are closely related. The World Bank's GCC for works is heavily based on FIDIC Red Book conditions, with modifications to accommodate development-bank requirements such as anti-corruption provisions, bank inspection rights, and dispute resolution compatible with international arbitration. Contractors familiar with the Red Book will find the World Bank GCC broadly familiar.
What is the role of the engineer under a FIDIC Red Book contract?
The engineer is appointed by and paid by the employer but acts impartially between the parties when making determinations on claims and valuing variations. The engineer's role is central to day-to-day contract administration and is the first port of call for payment certificates, variation orders, and programme approvals.
How Bidovate helps
Bidovate puts FIDIC Red Book (Works) to work inside your capture and proposal workflow.
Understand works contract risk allocationSee Bidovate in action
Book a demo and we will show you the platform using your actual contract data.
Related terms
FIDIC Yellow Book (Plant & Design-Build)
The FIDIC Conditions of Contract for Plant and Design-Build, used for contracts where the contractor both designs and constructs or installs plant or works against the employer's performance requirements.
ViewGeneral Conditions of Contract (GCC)
The standardized legal clauses included in every contract of the same type under a given procurement framework, covering rights, obligations, payment, variations, disputes, and termination without modification.
ViewSpecial Conditions of Contract (SCC)
The project-specific contract clauses that amend, supplement, or delete provisions in the General Conditions of Contract to reflect the particular requirements of a single procurement.
ViewBill of Quantities (BOQ)
A structured list of all work items in a construction or supply contract, with quantities pre-measured by the procuring entity, against which bidders enter unit rates to produce a total bid price.
View